The AV-OL-CTRL-T2 Obstruction Lighting Controller is an application-specific control and monitoring system to provide a full turnkey solution for A1/I2 structures ranging between 45-106 meters (150 to 350 feet). These include telecommunication towers and utility towers, wind turbines, cranes, buildings and other tall structures.
The T2 Obstruction Controller comes fully assembled, ready to install central control unit.
The T2 Obstruction Controller is available in two input power configurations, a universal AC (90-264VAC) or 24-48 VDC (solar compatible) and comes with Star2M monitoring via SATCOM or GSM as options.
The best in class system power draw allows tower owners to utilize solar for locations lacking reliable and or cost-effective access to regular utility power. Avlite’s experience, knowledge and tools for solar applications provides years of maintenance free, off-grid operation with an emphasis on compliance.
With a range of accessories including brackets, cable and junction boxes, utility and telecommunication companies, electrical contractors and state and local governments can now quickly and easily purchase all obstruction lighting components from a single source, simplifying the ordering process and reducing the possibility of incompatible, stand-alone components from different manufacturers.